April 28, 2006
The other task I got done today was the right baffle inner wall. I made up the brackets that hold it to the floor, and riveted it all together. Things are moving along nicely now. These baffles are almost complete. Here it is installed on the plane. I still have to trim the top edges.

Again, there wasn’t enough material on the baffle floor to reach the inner wall. Another place for some filler. The left side is exactly like this too.

My order from Spruce arrived today too. My standby alternator, and the special grommets for the spark plug leads to pass them through the baffles. I’ll be looking at all that tomorrow.